The long range MDOT plans for MARC Penn Line service are to expand to 7 day service with greatly increased frequency- hourly IIRC with half-hourly at peak times. In order to have the capacity, the NEC between south of Baltimore to New Carrolton is to be expanded to 4 tracks, with a 3rd track to Union Station. The replacement for the B&P tunnel is probably going to have to be in place as well for 7 day increased frequency MARC DC to Balt service.

The Northeast Corridor Infrastructure Master Plan lays out the long term plans and needs to 3 or 4 track the NEC from Wilmington to DC for greater capacity, much of it for MARC long term needs. Unfortunately MD did not get it's $248 million application selected for the 4th track upgrade and BWI station rebuild for the BWI airport section from the Florida HSR funding re-allocations announced last month. If there is HSIPR funding in FY2012, MD will very likely submit the BWI station segment NEC application again.

Expanding MARC to 7 days for DC to BWI to Baltimore trips is a LOT less expensive than stretching Metro out to BWI. Faster too from Union station on a 125 mph line with fewer stops than on a 70 mph max speed Metro line with a whole bunch of station stops to BWI or Baltimore.

by AlanF on Jun 22, 2011 12:36 am • linkreport

Does this comment violate Greater Greater Washington's comment policy? If so, you can report it using this form and an editor will take a look.

What is the major reason you believe the comment violates the policy?
Comment is spam.
Comment attacks other individuals personally.
Comment criticizes the level of knowledge of another commenter or contributor.
Comment discourages others from posting their ideas.
Commenter is impersonating someone else.
Comment uses profanity or abusive language.
Comment advocates violent acts or harm to another.
Comment was posted in multiple areas of the site.
Comment is arguing about the comment policy.
Other:

Your name:
Your email:

Administrator pagespam