Greater Greater Washington

Report a Comment

Alex B.
The geometry of the east yard lead alignment as shown in the FEIS on pages 9, 14-16 in the Plans and Profile (54.4 MB PDF file) flies over the elevated alignment of the main line tracks that drop in the the median of the Dulles Greenway.

We haven't seen the preliminary engineering for Phase II to see what cost cutting changes may have been made from the FEIS along the alignment between the elevated station at the airport and the yard lead junction.

Hell we don't even know if the pocket track at the north end of Autopilot Drive is still in the plan.

by Sand Box John on Mar 23, 2012 1:53 pm • linkreport

Does this comment violate Greater Greater Washington's comment policy? If so, you can report it using this form and an editor will take a look.

What is the major reason you believe the comment violates the policy?
Comment is spam.
Comment attacks other individuals personally.
Comment criticizes the level of knowledge of another commenter or contributor.
Comment discourages others from posting their ideas.
Commenter is impersonating someone else.
Comment uses profanity or abusive language.
Comment advocates violent acts or harm to another.
Comment was posted in multiple areas of the site.
Comment is arguing about the comment policy.
Other:

Your name:
Your email:

Administrator pagespam