The H.D. Cooke Elementary School in Adams Morgan was just renovated, with an addition containing a gym and cafetorium, a modernized library and media center, new playing fields and more. The renovation also included some bicycle racks. Unfortunately, parents, staff and students discovered that the racks were installed too close together and too close to the wall, limiting the ability of cyclists to lock their bikes securely and to fit many bikes on the racks.

New racks at H.D. Cooke Elementary. Photo by Nancy Shia.
Worse, the racks are only about 11 inches apart, measured from the center of one to the center of the other. DDOT's standards require 30 inches. Widely spaced racks allow two bicycles per U, one on each side, whereas this spacing only accommodates one. And, with the narrow spacing, the handlebars of one bicycle conflict with those on either side.


Left: The racks are 18 inches from the wall. Right: They are only 11 inches apart.
Click on an image to enlarge. Photos by Nancy Shia.
WABA's Eric Gilliland said, "We all want DC kids to be more active and installing bike parking at elementary schools is a good start. However, for the bike parking to be effective the right type of rack needs to be selected and installed correctly. The intent here is good, but the execution leaves a bit to be desired."
The good news is that the racks are close to the entrance. The DDOT standards require placing racks within 120 feet, and preferably within 50 feet; these look to be about three feet away from the door area. That's great, as more prominent racks ensure people know about them, and if the entrance sees regular foot traffic, makes it harder to steal bikes unnoticed.
The Cooke renovation designers had the right idea in including racks, but either the architects or the contractors failed to read the instructions. Hopefully Cooke can get the racks moved quickly.
Comments
Post a Comment
- WMATA presents options for SmarTrip negative balances
- Teens and young adults aren't mosquitoes
- You know you've arrived when...
- Combine the Circulator and Metro maps for visitors
- For state legislature in Montgomery County
- For Prince George's County offices
- Navy Yard sidewalks get sustainable stormwater systems
Smart Growth
Add jobs, retail, and housing for all income levels in walkable places like
Wisconsin Avenue, Brookland, and Minnesota-
Transit
Provide more alternatives to driving by expanding Metro capacity, building streetcar lines, and speeding up buses. Grow ridership through better maps and schedules from signs to mobile devices. Read posts »
Public Space
Our roadways are our most valuable public places. Design them to accommodate safe walking and bicycling. Locate plazas and public parks to create numerous focal points for human activity. Read posts »
Traffic
Design neighborhoods around grids instead of cul-de-sacs. Avoid building new freeways or widening existing ones which only induces further sprawl. Read posts »
Parking
Drivers create substantial traffic by circling endlessly for scarce parking. Use pricing to manage curb space and dedicate the revenue to providing alternatives to driving. Read posts »
Architecture
Preserve our row house neighborhoods and beautiful architecture that engages pedestrians visually and functionally. Eschew bad modernism that turns its back on the street and the starchitects that peddle it to "make a statement." Read posts »
Education & Safety
Make our urban areas desirable places for people and families of all ages with the highest quality education and safe neighborhoods for all. Read posts »



by цarьchitect on Aug 28, 2009 11:27 am
They should install more of them and space them better this time. Too many bikeracks are not built to accomodate workbikes or cargo bikes and as the USA grows up and people use bicycles more frequently- including students- more upright and larger style bikes need to be included in their planning.
Skinny tires are going to become a specialty- and not the dominant type for all cyclists.
by w on Aug 28, 2009 11:53 am
by ogden on Aug 28, 2009 3:06 pm
by ah on Aug 28, 2009 3:29 pm
Do not confuse your personal experience with a residential architect with that of this school or any other commercial project. Commercial and residential architecture are almost different professions. Residential architects are very often one-stop shops designing not just walls, floors, ceilings, and enclosures, but also engineering services, landscape, interior design. Often the contractor or builder is contracted through the architect, and thus the architect is responsible for the work the contractor does.
Commercial architecture is completely different. The architect's contract with the client is separate from the contractor's contract with the client (except in design build circumstances, in which case the architect works for the contractor not the other way around). As the contracts are separate, it is the client who is responsible for enforcing the terms of the contract and making sure the contractor builds according to the recommended procedures or the design. And the design of landscaping, interior design, and engineering are usually also separate contracts and the client is the only one who can dispute the design or construction with any of these parties.
by ogden on Aug 28, 2009 5:31 pm
School design is also much different from office commercial work in terms of scope. It's quite possible that they specified a type of bike rack for a bounded space, or simply a number of racks. It's also possible they contracted it off to a landscape architect. Installation and project supervision are different purviews, but someone made a mistake, and the endless buck-passing of construction is a waste of time and money for everyone.
by цarьchitect on Aug 28, 2009 6:49 pm
Regardless of it is a school or a house or any other type of structure, the laws in place regulating the architecture profession not only absolve the architect of responsibility but in fact prevent an architect from directing, instructing, or interfering in the work on the jobsite. They can only advise the client about actions or circumstances observed on the job site. And all of this is because architects themselves have lobbied for their own professional regulations to restrict their liability.
And all of this assumes that the bike rack installation was in any way related to the school renovation. It is entirely possible that the fixtures were ordered through a district requisition process and installed by the school facilities maintenance staff.
by ogden on Aug 28, 2009 8:04 pm
by shy on Aug 28, 2009 9:45 pm
by цarьchitect on Aug 29, 2009 12:18 am
With Eastern Market, the project was coordinated by the construction division of the DC Office of Property Management (now it has a new name). Curtis Clay, an architect as it happens, was the project manager.
Frankly, I think he is an unheralded hero of the project.
The project manager brings together all the various pieces, including installation of bike racks.
However, the Eastern Market project was aided by public oversight, specifically the capital improvements committee of the Eastern Market board, which has a bunch of incredibly detailed oriented members (not that I always agreed with them), and members of this committee often attended the project construction coordination meetings (either the OPM ones or the DDOT meetings wrt the reconstruction of 7th Street).
And yes, frequently there were differences of opinion between the architects, DDOT, or other participants in the total project.
We had this level of involvement wrt Eastern Market because of the law governing the market's operations. But typically public projects like this (and certainly private construction projects) do not have this kind of community involvement, which we can call another set of eyes if you will, making these kinds of errors (the bike racks) more likely. (And having more eyes isn't perfect either, as I could recount to you battles on the skylights--the vendors didn't want them, how many trees for North Plaza--I say 3, they say 5, where bicycle racks should be placed, parking policy for the back parking lot--I say put in meters, etc.)
by Richard Layman on Aug 29, 2009 7:54 am
The only way to know is to be able to look at the page of construction documents for that item.
by Richard Layman on Aug 29, 2009 7:57 am
by ah on Aug 29, 2009 9:14 pm
Ref- http://pdf.directindustry.com/pdf/thomas-betts/red-dot-weatherproof-lighting/19554-50234-_3.html
by shy on Aug 30, 2009 12:01 am
by ah on Aug 30, 2009 9:54 pm